Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Tokiwa, Yoshifumi; Aoki, Dai*; Haga, Yoshinori; Yamamoto, Etsuji; Winiewski, P.*; Onuki, Yoshichika
Journal of the Physical Society of Japan, Vol.70, Supplement A, p.40 - 42, 2001/05
no abstracts in English
Agematsu, Takashi; Arakawa, Kazuo; *
Proc. of 11th Symp. on Accelerator Sci. and Technol., p.446 - 448, 1997/00
no abstracts in English
Shimada, Taihei; Kabasawa, M.*; Nakayama, K.*; Hashimoto, H.*; Harami, Taikan; Suzuki, Hiromitsu
Proceedings of the 7th Symposium on Accelerator Science and Technology, p.305 - 308, 1989/00
The synchrotron and the beam transport lines have been designed. These are used as a part of the injection system for the 8 GeV storage ring of SPring-8. To keep high injection-efficiency into the storage ring, the emittance of the beam is designed to be smaller than 200 nm rad and transverse phase-space matching is made at the injection point of the ring. The calculation about the beam transport lines and the synchrotron is performed using the code SYNCH.